Project score
Connectivity score
Location score
Investment score
Construction Start Date : Jul 2016
Possession : Jul 2020
Total Land Area : 15.74 Acres
Number of Units : 979
Tower Details : Number of towers:16
Floor Details : 4+Ground+2 Basements
Other Information : One Car parking for every apartment
Project Approval : BBMP
Furnished? : Unfurnished
Water Facility : BDA
Total Free Space : 60 percent
Sanction plan from: BDA
Commencement Certificate (For under construction property):
Khata Certificate and Khata Extract:
Bangalore Electricity Supply Company (BESCOM):
Bangalore Water Supply & Sewerage Board (BWSSB):
Swimming Pool
Toddler's Pool
Children's Play Area
Tennis
Club House
Home Theater
A Well Equipped Gymnasium
Rain Water Harvesting
StructureMain Door : 8 Feet High Opening with Pre-Moulded Flush Shutters and Frame in Woods Toilet Door : 7 Feet High Opening with Wooden Frames and Flush Shutters Other Internal Door : 7 Feet High Opening with Wooden Frames and Flush Shutters Balcony Door : UPVC Frames and Shutters |
Flooring GeneralMain Lobbies : Granite/Marble flooring Common Lobbies & Corridors : Granite/Marble flooring |
FlooringIndividual Unit Foyer, Living & Dining : Vitrified Tiles flooring Master Bedroom : Vitrified Tiles flooring Kitchen : Vitrified Tiles flooring All Bedrooms : Vitrified Tiles flooring Balconies & Utility : Anti-skid Ceramic Tiles flooring Toilets : Anti-skid Ceramic Tiles flooring |
False CeilingFalse Ceiling will be prived in all the bathroom Attic or Storage or Utility : Utility Toilets : Ceramic tile dado Kitchen : 2 feet Ceramic tile dado above the Granite Counters |
KitchenGranite counter and Sink : Single Bowl Single Drain Steel Sink with Chrome-plated Tap |
ToiletsWash basin -Master Bedroom : Granite Counter with Ceramic Wash Basin Wash basin -Other Bedroom : Pedestal Wash Basins EWC's -Master Bedroom EWC's -Other Bedrooms |
PaintingInternal Walls & Ceilings : OBD External finish : Cement Paint MS Grilles & Railings : Enamel paint |
Toilets: CP Fittings & AccessoriesHot & Cold Water Mixer Shower Fittings : Shower cubicle |
Electrical Outline Specification2 BHK Flat : 4 KVA 3 BHK Flat : 6.4 KVA 100% DG back up for lifts, pumps & common area lighting Concealed PVC conduits with Copper wiring Modular Switches of reputed make |
AC PointsMaster Bedroom All other bedrooms &Â living room |
TV PointsLiving Master Bedroom All other Bedrooms |
Telephone PointsLiving Master Bedroom All other Bedrooms |
Price Range | 3487050 - 6618240 |
Price Per Sqft | 5670 - 5745 |
Booking Amount | 200000 |
Floor rise Charges | 25 per floor per sq ft |
Parking Charges | 400000 |
Maintenance deposit/Corpus /Sinking fund(Rs) | 50 per sq ft |
Bescom (Rs/sft) | 130 per sq ft |
Bwssb charges | 130 per sq ft |
Maintenance Charges (Rs/sft/ month) | 50 per sq ft |
Generator charges | 36000 - 60000 |
Khatha & Assessment charges | 25000 |