Project score
Connectivity score
Location score
Investment score
Launch Date : Jan 2017
Possession : Jun 2021
Progress from the day of start : Block work in progress
Total Land Area : 11 Acres
Number of Units : 824
Tower Details : Number of towers:10
Floor Details : 21+Ground+2Basements
Water Facility : BWSSB
Total Free Space : 78 percent
Commencement Certificate (For under construction property):
Khata Certificate and Khata Extract:
Bangalore Electricity Supply Company (BESCOM):
Bangalore Water Supply & Sewerage Board (BWSSB):
Booking Clause: 10% from total cost
Swimming Pool
Toddler's Pool
Outdoor Play Field
Open Amphitheatre
Outdoor party Area
Cricket Net
Children's Play Area
Basketball Court
Tennis
Pickup and Drop-off Point
Club House
Swimming Pool With Toddlers Pool
Conference Room
Gymnasium
Sewage Treatment Plant
Rain Water Harvesting
StructureMain Door : Woodenised wood frame with architraves veneer shutter on one side Toilet Door : Wood frame flush shutters with paint finish. Other Internal Door : Wood frame flush shutters with paint finish. |
WindowVentilators: : Aluminium ventilators |
Flooring GeneralMain Lobbies : Granite/Vitrified Flooring Common Lobbies & Corridors : Granite/Vitrified Flooring Staircases - Main entry level : Kota Stone flooring All other Staircases : Kota Stone flooring |
FlooringIndividual Unit Foyer, Living & Dining : Vitrified Tiles flooring Master Bedroom : Vitrified Tiles flooring Kitchen : Vitrified Tiles flooring All Bedrooms : Vitrified Tiles flooring Balconies & Utility : Antiskid Ceramic tiles flooring Toilets : Antiskid Ceramic tiles flooring |
False CeilingToilets : Glazed / Ceramic tile dado up to 7' height |
KitchenGranite counter and Sink Sink and Tap Fittings |
ToiletsWash basin -Master Bedroom Wash basin -Other Bedroom EWC's -Master Bedroom EWC's -Other Bedrooms False Ceiling |
PaintingInternal Walls & Ceilings : Plastic emulsion paint | Ceilings with oil bound distemper External finish : Weather coat texture paint |
Toilets: CP Fittings & AccessoriesChromium Plated Fittings Hot & Cold Water Mixer Shower Fittings CP Health Faucet |
Electrical Outline Specification2 BHK Flat : 5 KVA 3 BHK Flat : 6 KVA 100% DG back up for lifts, pumps & common area lighting Concealed PVC conduits with Copper wiring Modular Switches of reputed make |
AC PointsMaster Bedroom |
TV PointsLiving Master Bedroom |
Telephone PointsLiving Master Bedroom |
Other Electrical pointsWater Purifier point : In kitchen Washing machine point : In utility |